Quality tools, risk responses, contract types and procurement processes.
40 cards · basic cards · AI-written, checked twice. Edit anything.
- What is an Ishikawa diagram used for?
Show answer
Root cause analysis and identification of factors contributing to a problem.
- What does the Pareto principle state?
Show answer
Approximately 80 percent of effects come from 20 percent of causes.
- What does a control chart track?
Show answer
Process performance over time against upper and lower control limits.
- What does a scatter diagram show?
Show answer
The relationship and correlation between two variables.
- What does a histogram display?
Show answer
The frequency distribution of a single variable across a range.
- What is a run chart used to track?
Show answer
Trends in process performance over time.
- What does a flowchart model?
Show answer
The sequence of steps and decision points in a process.
- What is the primary purpose of a check sheet?
Show answer
To collect data in a structured, organized way.
- What does Six Sigma represent?
Show answer
A quality standard of 3.4 defects per one million opportunities.
- What does SPC stand for?
Show answer
Statistical Process Control.
- What is risk avoidance?
Show answer
Changing the project scope or plan to eliminate the risk entirely.
- What does risk mitigation do?
Show answer
Reduces the probability or impact of a risk occurring.
- What is risk acceptance?
Show answer
Acknowledging the risk and deciding to deal with its consequences if it occurs.
- What does risk transfer accomplish?
Show answer
Shifts the impact or responsibility of the risk to a third party.
- What is risk escalation?
Show answer
Informing senior management or sponsor about a risk that cannot be managed at current level.