PMP Quality, Risk and Procurement Management

Quality tools, risk responses, contract types and procurement processes.

About this set

40 basic cards for PMI / ITIL Project Management. It opens with "What is an Ishikawa diagram used for?" and "What does the Pareto principle state?". More Professional Certifications decks are listed below.

40 cards · basic cards · AI-written, checked twice. Edit anything.

Study this set free Look inside first Get FlashKeepers for iPhone

Opens in your browser, no account. Get the iPhone and iPad app · Android app

What is an Ishikawa diagram used for?
Show answerRoot cause analysis and identification of factors contributing to a problem.
What does the Pareto principle state?
Show answerApproximately 80 percent of effects come from 20 percent of causes.
What does a control chart track?
Show answerProcess performance over time against upper and lower control limits.
What does a scatter diagram show?
Show answerThe relationship and correlation between two variables.
What does a histogram display?
Show answerThe frequency distribution of a single variable across a range.
What is a run chart used to track?
Show answerTrends in process performance over time.
What does a flowchart model?
Show answerThe sequence of steps and decision points in a process.
What is the primary purpose of a check sheet?
Show answerTo collect data in a structured, organized way.
What does Six Sigma represent?
Show answerA quality standard of 3.4 defects per one million opportunities.
What does SPC stand for?
Show answerStatistical Process Control.
What is risk avoidance?
Show answerChanging the project scope or plan to eliminate the risk entirely.
What does risk mitigation do?
Show answerReduces the probability or impact of a risk occurring.
What is risk acceptance?
Show answerAcknowledging the risk and deciding to deal with its consequences if it occurs.
What does risk transfer accomplish?
Show answerShifts the impact or responsibility of the risk to a third party.
What is risk escalation?
Show answerInforming senior management or sponsor about a risk that cannot be managed at current level.

25 more cards in the app