Critical path method, earned value, scheduling, cost estimating, safety, and construction materials such as concrete mixes.
35 cards · basic cards · AI-written, checked twice. Edit anything.
- What is the critical path in a project network?
Show answer
The longest sequence of dependent activities that determines the minimum project duration.
- What does slack or float mean in CPM analysis?
Show answer
The amount of time an activity can be delayed without delaying the project completion date.
- What determines the minimum project duration in a CPM network?
Show answer
The length of the critical path.
- What is the difference between total float and free float?
Show answer
Total float is the delay allowed without delaying project completion; free float is the delay allowed without delaying the next activity.
- What is a dummy activity in a CPM network diagram?
Show answer
A zero-duration activity used to show logical dependencies without consuming time or resources.
- What does a forward pass calculate in CPM?
Show answer
The earliest start and earliest finish times for each activity.
- What does Earned Value (EV) represent?
Show answer
The value of work actually completed, based on the approved project budget for that work.
- What is the Cost Performance Index (CPI)?
Show answer
The ratio of Earned Value to Actual Cost: CPI = EV / AC. A CPI greater than 1 means the project is under budget.
- What is the Schedule Performance Index (SPI)?
Show answer
The ratio of Earned Value to Planned Value: SPI = EV / PV. An SPI greater than 1 means the project is ahead of schedule.
- What is the Estimate at Completion (EAC)?
Show answer
The projected total cost of the project at completion, calculated as BAC / CPI.
- What does BCWP stand for?
Show answer
Budgeted Cost of Work Performed. It is the same as Earned Value (EV).
- What does BCWS stand for?
Show answer
Budgeted Cost of Work Scheduled. It is the same as Planned Value (PV).
- What does ACWP stand for?
Show answer
Actual Cost of Work Performed. It is the same as Actual Cost (AC).
- What is the Variance at Completion (VAC)?
Show answer
The difference between Budget at Completion and Estimate at Completion: VAC = BAC - EAC. A positive VAC means the project is under budget.
- What is a Gantt chart?
Show answer
A horizontal bar chart that shows project tasks, their durations, and their relationships over time.